01 · The challengeNew drainage, utilities and structural interfaces
A complete drainage system and utility infrastructure had to be installed across difficult levels. New construction also had to be tied into the retained structure, so the structural, architectural and services information needed close coordination.
02 · The responsePlanning infrastructure before internal finishes
We planned the project around the structural and infrastructure work first. JBP sequenced the drainage, utilities, structure and internal layouts so the work ran in order from enabling works through to finishes.
03 · The resultAn 18-bedroom HMO delivered in 28 weeks
The completed HMO has 18 bedrooms and 12 bathrooms, with finishes chosen to suit the character of the original building. The design and build programme took 28 weeks.